The total resource volume within the licensed area of Liangchahe Phosphate Mine is about 21.33 million tons of phosphate, with the average P2O5 grade reaching 32.56%. The overall capacity is about 800 kt/a based on the preliminary design, phased development and production shall be executed in two blocks, including 300 kt/a from the South, where development was commenced in 2022 already, targeting at a construction period of 1 year and production phase of 20 years; 500 kt/a from the North, targeting at a construction period of 3 years and production phase of 18 years. The final product shall be raw phosphate ore, with an average grade of 30.31%.
Fax:010-83203999-9752
E-mail:jchx@jchxmc.com
Address (Miyun Office Area) : No. 28, Shuiyuan West Road, Economic Development Zone, Miyun District, Beijing
Postcode:101500
Address (Fengtai Office Area) : Jinxin Building, Building 12, Nord Center III, Fengtai District, Beijing
Postcode:100070
Copyright © 2018-2022 Jinxin Mining Management Co., LTD. All Rights Reserved
Record number: Beijing ICP No. 08105072