金诚信股票代码

603979

29

2022-12

Monthly Sinking Rate Exceeded ···

Monthly sinking rate (lining included) at 2# air return shaft of Cukaru-Peki Project (a world class copper & gold deposit) reached 103.5m in November, exceeding the monthly target, for which, Ziji···

29

2022-12

JCHX Proposed to Invest US$ 10···

A conditional Framework Agreement was signed among JCHX, Cordoba Minerals (a subsidiary of Ivanhoe Capital Group) and its wholly-owned subsidiaries on December 8, 2022 to jointly develop the Alacran P···

21

2022-11

October Output at Kinsey Reach···

On 11 November, Zijin Serbia sent a letter to congratulate Kinsey for its successful large-diameter long-hole stoping with a monthly output (including by-product) of 95,757 tons in October. It also ex···

21

2022-11

JCHX Invited to Technical Semi···

On October 25th, the 1st Technical Seminar on Block Caving Method hosted by Zijin Mining, Serbian Ministry of Mines and the Serbian Association of Mining and Geological Engineers was held in Belgrade.···

21

2022-11

Monthly Output in Chambishi Re···

Recently, good news came from Chambishi Project that monthly output reached 148,999 tons in October, hitting a monthly record high over the past five years. Besides, the monthly production in the new ···

21

2022-10

Accurate Breakthrough Achieved···

An accurate breakthrough was recently achieved at decline of Musonoi Copper Mine between 400ml to 320ml with a total length of 920m, after 9 months of hard work, marking another triumph in ultra-long ···

21

2022-10

Kinsey Output Hitting A Record···

Recently, good news came from Kinsey Project that monthly output (including by-product) reached 93,441 tons in September, hitting a record high since the commencement of production.Following the leade···

20

2022-09

Hoisting of Semi-Autogenous Mi···

On August 22, hoisting of the semi-autogenous mill (SAM) machine in the grinding workshop at Lonshi Copper Mine of Sabwe Mining SARL (Sabwe) was successfully completed, marking the transition of the p···

20

2022-09

Good News!Breakthrough Achieve···

Successful breakthrough was achieved at LV Decline of Kamoya Copper & Cobalt Mine at the sound of a blast on 24th Aug by Beam Mining & Construction SARL, marking another triumph of breakthroug···

15

2022-09

Underground Mine Development &···

Recently, the contract of underground mine development and mining engineering has been signed between Kingko Construction SARL, a subsidiary of JCHX, and Kinsenda Copper Company SA, a subsidiary of Me···

金诚信矿业管理股份有限公司

010-83203999 

公众号

金诚信JCHX

协同办公
联系方式

总裁信息

传真:010-83203999-9752

企业邮箱

E-mail:jchx@jchxmc.com

地址(密云办公区):北京市密云区经济开发区水源西路28号

邮编:101500

地址(丰台办公区):北京市丰台区诺德中心三期12号楼金诚信大厦

邮编:100070

Copyright © 2018-2022 金诚信矿业管理股份有限公司 All Rights Reserved

备案号码:京ICP备08105072号